MFD Flint Tool & Die

Metal Fabrication Division

425 Stevenson St.
Flint, MI 48504, USA
  • This information has been verified good Verified Good
  • This information has been verified bad Verified Bad
  • This information has unverified Unverified

Additional Information

General Information

General Motors - Cisco 31031
Latitude / Longitude
Latitude = 43.014793
Longitude = -83.704464

Financial Information

General Motors - Current Stock Price
Ticker Symbol - GM
CURRENT = 33.43 +1.36 +4.24%
OPEN = 32.4 HIGH = 33.54 LOW = 32.23

Latest Financial News

General Motors Is Sued by Arizona for $3 Billion Over Recalls
New York Times - Nov 20, 2014
It said “New G.M.,” the term used for the company that emerged from bankruptcy in 2009, “was not born innocent.
Arizona is first US state to sue GM over delayed recalls - Reuters
Arizona Accuses GM of $3 Billion Ignition-Switch Fraud - Bloomberg

Latest Company News

NYSE stocks posting largest percentage increases

Fri, 28 Nov 2014 11:11:51 -0800
A look at the 10 biggest percentage gainers on New York Stock Exchange at 1 p.m.: United Continental Holdings Inc. rose 8.2 percent to $61.23. Southwest Airlines Co. rose 6.4 percent to $41.81. Delta Air ...

read more

Other Information

This company is affiliated with...
Employment
362
Products
Die and pattern construction: Recent projects include engineering and development of dies for the Chevrolet Cruze and Volt and Cadillac CTS coupe.
Plant Size
318,000 sq. ft.
Site Size
13.59 Acres
History
Built in 1967 as the Chevrolet Die and Engineering Center, this facility was subsequently managed by the former Buick-Oldsmobile-Cadillac Groups Detroit Product Team beginning in 1985, then by the Cadillac Luxury Car Division beginning in 1987, and then by the Die Management Group beginning in 1991. In 1997, Flint Tool & Die became the only stand-alone die construction facility in GM.
Investments
$12 million for a new Die Verification Cell
Awards
United Way Gold Level Award as an outstanding corporate contributor Flint Tool & Die Organization is the proud producer of all phases of GMs die construction process. Flint is the only stand alone die construction facility within GMs tool and die operation. More than 300 team members are involved in all phases of GMs die construction process including die design, solid modeling, pattern making, machining, blocking, assembly and verification.