- Facility / Union Locator
- Local News
- General Motors
- Ford
- Chrysler
- Toyota
- UAW
- OPEIU
- AFL-CIO
- Lear
- Delphi
- TRW
- AAM
MFD Marion
Metal Fabrication Division
2400 W. 2nd St.Marion, IN 46952, USA
- Verified Good
- Verified Bad
- Unverified
Additional Information
General Information
General Motors - Cisco 18095
Latitude / Longitude
Latitude = 40.559716
Longitude = -85.693086
Latest Company News
Other Information
Employees - Hourly
1161
Employees - Salary
164
Employees - Temporary
75
Products
The plant provides stamping and assembly of sheet metal for cars, minivans, trucks and SUVs. Major parts include doors, hoods, deck lids, quarter panels, hinge pillars, wheelhouses, dash panels, Suburban & Tahoe roof panels, GMX206 and numerous service parts.
Facilities
Stamping Center Building and Powerhouse
Year Opened
November, 1956
Recent Major Investments
In 2007 and 2006 GM invested $47.5 million to install a new flex line, AA5x press, GMT900 fender inner assembly cells, tie bar assembly cell and white light measurement system.
As a result of the stamping consolidation, GM’s Marion Metal Center is realizing significant capital expansion. General Motors announced in October 2009, that it is investing approximately $364 million in the Marion Stamping facility including die transfers, press transfers, press upgrades and weld transfers.
Plant Size
2.1 Million sq. ft.
Site Size
187 Acres
Recent Awards
- 2008 Zero Landfill Facility
- 2004 Chairman’s Honor for Safety
Description
Marion Metal Center was built in 1955 as an automotive stamping facility by Fisher Body. During the General Motors reorganization in 1984, the plant was assigned to Chevrolet-Pontiac-GM of Canada Group. In 1992, it was realigned with GM's Cadillac/Luxury Car Division. The plant became part of the GM Metal Fabricating Division when it was formed in 1994 and is now part of GM Manufacturing Stamping. Marion Stamping Center is located off Interstate 69 at exit 64 and approximately 42 miles south of Fort Wayne and 64 miles north of Indianapolis. The parts manufactured in Marion are shipped to GM’s assembly plants in; Pontiac, Flint, Lansing Grand River, Lansing Delta Township, Detroit Hamtramck and Orion, MI, Fort Wayne and Indianapolis, IN, Shreveport, LA, Dayton and Mansfield, OH, Wentzville, MO, Fairfax, KS, Springhill, TN, Arlington, TX, Oshawa, Canada and Silao, Mexico.
Other General Motors Locations
- DMax Ltd.
- GM Corporate Offices
- GM Desert Proving Grounds
- GM Powertrain Honeoye Falls Fuel Cell Facility
- GM Technical Center
- GMPT Allison Indianapolis
- GMPT Baltimore
- GMPT Bay City
- GMPT Bedford
- GMPT Defiance
- GMPT Flint South
- GMPT Fredericksburg
- GMPT Livonia
- GMPT Parma
- GMPT Romulus Engine
- GMPT Saginaw Metal Casting
- GMPT Spring Hill